Spring Time Opening
Pool opening takes place from early to late spring. Below are the steps we take to ensure your pool is opened safely. The process takes 3-7 business days depending on pool size.
- Draining of waste water from surface of the pool cover (if any)
- Removal of leaves and organic waste from the cover surface (storage in paper waste bags and placed for garbage removal)
- Removal of cover, rinsing with preservative, folding and storage
- Assembly of all filtration, sanitation and heating equipment
- Removal of debris from inside of pool
- Treatment of water with appropriate chemicals
- Skimming and vacuuming the pool for swim ready
Winter Covers
$499
- Drain Cover
- Remove Water Bags
- Remove Winter Cover
- Bag Leafs for city pickup
- Wash Cover and water bags
- Fold Cover and water bags
- Insert Return jets
- Assemble Pump and Filter
- Assemble Heating system
- Remove Large objects from the pool
- Treat Water with Chlorine
- Brush Wall and Floor
- Skim and Vacuum pool
- Balance Chemicals for patrons
- All chemicals included*
Safety-Net
$399
- Blow leafs off
- Bag for City pickup
- Remove Safety Net and tighten anchors
- Fold Cover
- Insert Return jets
- Assemble Pump and Filter
- Assemble Heating system
- Remove Large objects from the pool
- Treat Water with Chlorine
- Brush Wall and Floor
- Skim and Vacuum pool
- Balance Chemicals for patrons
- All chemicals included*
Above Ground Pool
$379
- Drain Cover
- Remove Winter Cover
- Bag Leafs for city pickup
- Wash Cover
- Fold Cover
- Insert Return jets
- Assemble Pump and Filter
- Assemble Heating system
- Remove Large objects from the pool
- Treat Water with Chlorine
- Brush Wall and Floor
- Skim and Vacuum pool
- Balance Chemicals for patrons
- All chemicals included*
Spill Over Spa
$79
- Drain Spa
- Insert return jets
- Insert main drain covers
- Treat Water with Chlorine
- Brush Wall and Floor
- Skim and Vacuum spa
- Balance Chemicals for patrons
- All chemicals included*